623-824-2343
Loading Dock

Loading Dock

We were contracted to design/build a loading dock for the Portland Oregon yard of MP Environmental. The requirements were engineered for a 5ton forklift and accomodates 5 tracktror trailers. Additionally the removable ramp is adjustable so that it can be used for...