Insights on Welding and Fabrication

07 Project Test Scaled

Loading Dock

We were contracted to design/build a loading dock for the Portland Oregon yard of MP Environmental. The requirements were engineered for a 5ton forklift and accomodates 5 tracktror trailers. Additionally the removable ramp is adjustable so that it can be used for loading flatbed tractor trailers.

Loading Dock Read Post »

Mandril Finished Large

Mandril Build

Fabrication of a 33-foot mandril used in pier foundation systems. Utilized a 350 amp pulsed mig welder and completed at AMF in Phoenix Arizona.

Mandril Build Read Post »

Scroll to Top