Fabrication Shop

07 Project Test Scaled

Loading Dock

We were contracted to design/build a loading dock for the Portland Oregon yard of MP Environmental. The requirements were engineered for a 5ton forklift and accomodates 5 tracktror trailers. Additionally the removable ramp is adjustable so that it can be used for loading flatbed tractor trailers.

Loading Dock Read Post »

Mandril Finished Large

Mandril Build

Fabrication of a 33-foot mandril used in pier foundation systems. Utilized a 350 amp pulsed mig welder and completed at AMF in Phoenix Arizona.

Mandril Build Read Post »

Rack Outside E1692314123119

Aluminum Extrusion Racks

[et_pb_section fb_built=”1″ _builder_version=”4.21.0″ _module_preset=”default” global_colors_info=”{}”][et_pb_row column_structure=”2_5,3_5″ _builder_version=”4.21.0″ _module_preset=”default” global_colors_info=”{}”][et_pb_column type=”2_5″ _builder_version=”4.21.0″ _module_preset=”default” global_colors_info=”{}”][et_pb_text _builder_version=”4.21.0″ _module_preset=”default” global_colors_info=”{}”] We were contracted to

Aluminum Extrusion Racks Read Post »

Scroll to Top