623-824-2343
Loading Dock

Loading Dock

We were contracted to design/build a loading dock for the Portland Oregon yard of MP Environmental. The requirements were engineered for a 5ton forklift and accomodates 5 tracktror trailers. Additionally the removable ramp is adjustable so that it can be used for...
Pedestrian Walkway

Pedestrian Walkway

We were contracted to design/build a pedestrian walkway by the new ownership at Buckeye Equestrian Center. The requirements included spanning at 15′ lane for horseback riders with a 10′ clear height while giving spectators access to a new elevated VIP...
Horse Mesa Dam Bridge

Horse Mesa Dam Bridge

We were contracted through Technology Construction Inc to perform the field welding of a new bridge being installed near Canyon Lake. This was a bit of a rush job as the project was well underway but the company had lost their certified welder. Within two weeks of...