We were contracted to design/build a portable ramp to offload vaccum trucks into 20 yard roll off bins. This unit is transported by roll off truck/trailer, alleviating the need for a forklift on site. This united is rated for 60...
We were contracted to design/build a pedestrian walkway by the new ownership at Buckeye Equestrian Center. The requirements included spanning at 15′ lane for horseback riders with a 10′ clear height while giving spectators access to a new elevated VIP...
We were contracted through Technology Construction Inc to perform the field welding of a new bridge being installed near Canyon Lake. This was a bit of a rush job as the project was well underway but the company had lost their certified welder. Within two weeks of...