We were contracted to design/build a loading dock for the Portland Oregon yard of MP Environmental. The requirements were engineered for a 5ton forklift and accomodates 5 tracktror trailers. Additionally the removable ramp is adjustable so that it can be used for...
We were contracted to design/build a pedestrian walkway by the new ownership at Buckeye Equestrian Center. The requirements included spanning at 15′ lane for horseback riders with a 10′ clear height while giving spectators access to a new elevated VIP...
We were contracted through Technology Construction Inc to perform the field welding of a new bridge being installed near Canyon Lake. This was a bit of a rush job as the project was well underway but the company had lost their certified welder. Within two weeks of...
I was contracted to complete this project for a client of AMF in Phoenix. This 33′ Mandril is used to compact the foundation for piers and is designed/built to withstand significant stress. We welded a 3″ plate to a 31′ W-Beam, then modified the beam...
Completed @ AMF This was a complete repair & replacement of the cyclone system, ducts and boom for a GapVax Vac Truck. Replacement parts were purchased from Gap Vax and all demo & fabrication was completed at AMF in Phoenix.
These are a series of heavy equipment tracks we cut and welded at AMF for an outside client. Steel plate was 3/4″ cut on the plasma with 3x3x1/2″ angle welded. Built at AMF
I was contracted to build 12 of these aluminum extrusion racks from mild steel. They are 24′ long and 4′ wide and I maintained 1/8″ tolerances on all dimensions. In total over 70 individual pieces of steel go into each...
Project Summary My desire is to test the viability and benefit of using an off grid solar array to offset my utility costs of powering bitcoin miners at home. My goal is to produce 12 hours of mining power(130 Terahash) from solar and use my utility for the...